Bokang Metal Customer Cases

Successful Case Studies – Bokang Metal Stainless Steel Water Tank Projects

Bokang Metal provides one-stop water storage solutions, ranging from preliminary water tank design and manufacturing to installation, serving customers worldwide.

Our customer cases cover:

  • Residential quarter water storage systems
  • Industrial production water systems
  • Fire emergency water tank projects
  • Underground water storage systems
  • Public facilities and agricultural irrigation

Residential Quarter Water Storage Case

  • Location: Residential quarter
  • Products: Stainless steel welded water tank + ordinary liquid level meter + pump integrated linkage system
  • Capacity: 60tons
  • Features: High tightness, corrosion resistance, stable water supply
  • Excellent welding tightness and good leak-proof performance
  • High efficiency of the installation team, completed the project on time as required by the customer
  • The matched water pump, as suggested by the sales team, realizes automatic water supply of the water tank

Industrial Water Storage System Case

  • Location: Industrial factory
  • Products: Stainless steel welded water tank+magnetic flap level gauge
  • Capacity: 50tons
  • Features: Automated water supply+remote water level monitoring

The water pump is linked with the magnetic flap level gauge to achieve automatic control, improve water filling efficiency, and detect water level in real time. No need for on-site water level survey by staff, very intelligent.

Special-shaped Water Tank Project Case

  • Location: Corner open space of a factory
  • Product: Stainless steel welded water tank
  • Capacity: 88 cubic meters
  • Features: Due to limited site space, the sales team designed an irregular water tank to maximize the use of ground area without wasting any square meter.
  • Irregular shape requires high ability to interpret on-site welding drawings; wrong welding will result in re-manufacturing of the whole tank
  • Maximize the tank size without wasting site area
  • The tank operates normally after commissioning

Fire Water Tank Project Case

  • Location: Factory of a listed company
  • Products: CE-certified stainless steel welded water tank + magnetic flap level gauge + fire water pump system
  • Capacity: 610 tons
  • Features: Export order, meets Vietnamese national fire standards; real-time water level monitoring with magnetic flap level gauge and water pump
  • The water pump with magnetic flap level gauge eliminates the need for workers to check the water level on site, improves efficiency and avoids delayed water supply
  • CE certified, meets national safety standards and successfully passed acceptance
  • Our own installation team was responsible for on-site installation and commissioning, and delivered the project within the customer’s expected completion time

Underground Water Tank Project Case

  • Location: Overseas commercial complex
  • Products: Underground stainless steel water tank + water pump + liquid level meter
  • Capacity: 100 cubic meters
  • Features: Underground water storage, no ground area occupied, no impact on appearance
  • Anti-corrosion and anti-leakage design
  • One-stop customer solution, fully responsible from design and production to installation
  • Civil construction scheme before installation

Comprehensive Application Case

  • Products: Stainless steel welded water tank + magnetic flap level gauge + thermal insulation design
  • Capacity: 80 cubic meters
  • Features: The school is located in an area with large temperature difference, with the lowest temperature below minus 30°C. Thermal insulation is added to prevent water in the tank from freezing during emergency use. Linked with magnetic flap level gauge, no manual on-site water level inspection is required in extremely cold weather.
  • Anti-corrosion and anti-leakage design
  • Dual linkage design of thermal insulation, anti-freezing and magnetic flap level gauge

FAQ

Can the water tanks in the cases be customized?

Absolutely. Capacity, material and accessories can be customized according to your requirements.

How long is the general installation cycle?

On-site installation normally takes 1–2 days for water tanks under 50 tons, 2–3 days for under 100 tons, and about 3–5 days for large or super-large water tanks.

Does the water tank support automatic control?

Sure. Automatic control can be realized by linking the water pump with a magnetic flap level gauge or controller to achieve automatic start-stop and remote water level monitoring without on-site inspection.

How about the after-sales service?

All our one-stop orders come with a one-year warranty. During this period, you only need to perform regular maintenance on the water tank. We also provide supporting services such as regular maintenance suggestions and technical support.

Are the cases real?

All cases in this article are real cases of Bokang Metal. You can refer to them according to your site conditions or contact us for service.