Successful Case Studies – Bokang Metal Stainless Steel Water Tank Projects
Bokang Metal provides one-stop water storage solutions, ranging from preliminary water tank design and manufacturing to installation, serving customers worldwide.
Our customer cases cover:
- Residential quarter water storage systems
- Industrial production water systems
- Fire emergency water tank projects
- Underground water storage systems
- Public facilities and agricultural irrigation

Residential Quarter Water Storage Case
- Excellent welding tightness and good leak-proof performance
- High efficiency of the installation team, completed the project on time as required by the customer
- The matched water pump, as suggested by the sales team, realizes automatic water supply of the water tank

Industrial Water Storage System Case
The water pump is linked with the magnetic flap level gauge to achieve automatic control, improve water filling efficiency, and detect water level in real time. No need for on-site water level survey by staff, very intelligent.

Special-shaped Water Tank Project Case
- Irregular shape requires high ability to interpret on-site welding drawings; wrong welding will result in re-manufacturing of the whole tank
- Maximize the tank size without wasting site area
- The tank operates normally after commissioning

Fire Water Tank Project Case
- The water pump with magnetic flap level gauge eliminates the need for workers to check the water level on site, improves efficiency and avoids delayed water supply
- CE certified, meets national safety standards and successfully passed acceptance
- Our own installation team was responsible for on-site installation and commissioning, and delivered the project within the customer’s expected completion time

Underground Water Tank Project Case
- Anti-corrosion and anti-leakage design
- One-stop customer solution, fully responsible from design and production to installation
- Civil construction scheme before installation

Comprehensive Application Case
- Anti-corrosion and anti-leakage design
- Dual linkage design of thermal insulation, anti-freezing and magnetic flap level gauge
FAQ
Can the water tanks in the cases be customized?
Absolutely. Capacity, material and accessories can be customized according to your requirements.
How long is the general installation cycle?
On-site installation normally takes 1–2 days for water tanks under 50 tons, 2–3 days for under 100 tons, and about 3–5 days for large or super-large water tanks.
Does the water tank support automatic control?
Sure. Automatic control can be realized by linking the water pump with a magnetic flap level gauge or controller to achieve automatic start-stop and remote water level monitoring without on-site inspection.
How about the after-sales service?
All our one-stop orders come with a one-year warranty. During this period, you only need to perform regular maintenance on the water tank. We also provide supporting services such as regular maintenance suggestions and technical support.
Are the cases real?
All cases in this article are real cases of Bokang Metal. You can refer to them according to your site conditions or contact us for service.
